room equipment failure to get out of the situation, if a serious problem to his own emergency rescue, must be high-level by the Planetary Data and the Chi of the engineering watch more than 90 percent to the 1st room for medical reasons can not be terminal on the simultaneous operation in order to open the emergency rescue to rescue the event of equipment failure, the first cut off the supply to the third channel and the core of the engine room, and wait until the standby generating set automatically start the core of the engine room in the run two weeks after the energy consumption do, all of the safety facilities, such as automatic machine guns there is no energy supply lost, and then the the zha drug or strong corrosive to get the channel open in response to the special circumstances that may arise, all of Chi room are equipped with a large number of food and drink water and a flashlight, batteries and other emergency items.
Particularly good because the quality of components used in the construction of the Chi machine room, the high reliability of the overall design, and all sets of mutually redundant, built from the engine room to now,nba toddler jersey, almost never happened to any failure, only a very few small devices replacement and contingency plans have never enabled. Nevertheless, just in case,basketball shoes for boys, even the nfl I have very little to the core of the engine room to go into the core of the engine room, and never with Guo Hailin two, so as not to get out go after but at this time, Guo Hailin think that can only start the em
No comments:
Post a Comment